PLN’s PLTD Apung (Floating Diesel Power Plant), washed away by tsunami wave on December 26, 2004. With a length of 61 m, 19 m wide, 4.1 m height and weight up to 2,600 ton this huge barge is washed away with a wave speed 300 km/h and stranded up to 5 km inland. Now located at Gampong Punge Blang Cut, Banda Aceh, it become a public museum and tourism object.
Floating diesel power plants weighing 2600 tons washed away by tsunami wave with a speed of 300 km/h and stranded up to 5 miles inland.
Museum PLTD Apung dihempas gelombang tsunami dengan kecepatan 300 km/jam dan terdampar hingga 5 km ke daratan
Museum PLTD Apung dihempas gelombang tsunami dengan kecepatan 300 km/jam dan terdampar hingga 5 km ke daratan
Floating diesel power plants weighing 2600 tons washed away by tsunami wave with a speed of 300 km/h and stranded up to 5 miles inland.
Museum PLTD Apung front yard